Overview:

A farm in Chilliwack contracted Sama Services to excavate trenches for a subsurface drainage system to improve soil quality and crop yield. Timeliness was crucial as the window between harvest and planting was limited.

Execution & Results:

Using trenchers and mini-excavators, we laid over 1,200 meters of drainage pipe in under 7 days. Soil was tested and redistributed to preserve topsoil quality. The system significantly reduced water pooling and helped increase spring crop productivity. The farmer has since expanded the system to other plots.

Project Highlights:

  • Completed 1,200+ meters of trenching in just 7 days
  • Preserved and redistributed topsoil to protect fertility
  • System reduced waterlogging and increased crop health
  • Timely project delivery between harvest and planting
  • Repeat work awarded by the same client for expansion

Archives

Project info

Pleasure and praising pain was born and I will give you a complete account of the systems and the actually teachings of the great explorer .

  • ClientIndu Designers
  • CategoryIndustrial
  • Start Date28th Jan 2025
  • End Date28th Feb 2025
  • Project Value$1250.00
  • LocationNewyork City, USA
protfolio
protfolio
protfolio