Overview:

An industrial client engaged Sama Services to demolish an old steel-and-concrete warehouse in Abbotsford to clear the site for a logistics hub. The project involved hazardous materials and was located near active businesses.

Execution & Results:

Before demolition, an environmental assessment identified asbestos insulation. Sama coordinated certified removal, followed by controlled mechanical demolition. Dust suppression systems were used throughout. All debris was segregated and hauled to certified recycling facilities, keeping 85% of material out of landfills. The site was left graded and ready for construction.

Project Highlights:

  • Precision excavation with minimal crop disturbance 
  • Custom-designed drainage pattern for the field topology 
  • Boosted productivity through better water control 
  • Post-installation support and maintenance guidance

Archives

Project info

Pleasure and praising pain was born and I will give you a complete account of the systems and the actually teachings of the great explorer .

  • ClientIndu Designers
  • CategoryIndustrial
  • Start Date28th Jan 2025
  • End Date28th Feb 2025
  • Project Value$1250.00
  • LocationNewyork City, USA
protfolio
protfolio
protfolio